The wall by Neumann Bygg in Sandviken, was painted in relation to the WC in bicycling 2017. Well that would be the main part. Then stuff has been added and as late as in 2022 things was changed and/or added to the wall. Since then it has been like it can be seen today (Aug. 2023).