The project was implemented in the youngest city of Russia - Innopolis. Every year the infrastructure of the city is changing. A link appears between the individual buildings in an open field.
The new residential complex was built taking into account the traffic load, parking for residents is organized at ground level, and the courtyard area is at the level of the second floor. Such a yard is safer for residents.
Ramps and stairways to the yard were formed. These have become key transit routes for residents.
At the initiative of the residents themselves, it became necessary to transform the end surfaces.
Workshops were organized with residents, the results of which took into account the characteristics