pxpxBack
Created on December 31, 2016 – removed
Steeler Str. 38, Essen, Deutschland
Navigate

Gabor Doleviczenyi, Zinnober, kids of Frida-Levy-Gesamtschule

Altes Hauptbad

In December 2015, Essen's central indoor swimming pool was closed. Since then it was discussed to demolish it, as ambitions to make it a listed building failed. In October 2017 the new design of the facade, which was developed by students of  Frida-Levy-Gesamtschule and Zinnober Kreativagentur in a project course, was presented to the public.Old bath house was demolished in November 2021.

Gabor Doleviczenyi, Zinnober, kids of Frida-Levy-Gesamtschule—Altes HauptbadGabor Doleviczenyi, Zinnober, kids of Frida-Levy-Gesamtschule—Altes HauptbadGabor Doleviczenyi, Zinnober, kids of Frida-Levy-Gesamtschule—Altes HauptbadGabor Doleviczenyi, Zinnober, kids of Frida-Levy-Gesamtschule—Altes HauptbadGabor Doleviczenyi, Zinnober, kids of Frida-Levy-Gesamtschule—Altes Hauptbad

Hunted by Andrea Ranke. Pictures by Andrea Ranke (04/2021).